We Serve

Industrial Machinery

Factory Decommissioning, Fully Managed

Plant decommissioning in Upstate SC requires coordinated removal across multiple material types — structural steel, presses, conveyors, cranes, and mixed electrical infrastructure. We manage equipment identification, extraction, and transport from your site to our Fountain Inn facility. A Fuchs 360 material handler, three skidsteers, and 10 acres of poured concrete yard. Volume is not the constraint. Getting it done is.

Industrial Equipment

Presses, machine tools, motors, and plant equipment purchased by tonnage.

Structural Steel & Plate

Beams, plate, and fabricated steel recovered from plant clearouts.

Electrical & HVAC Infrastructure

Switchgear, cable, conduit, and HVAC equipment from decommissioned facilities.

Conveyors & Process Equipment

Conveyors, hoppers, and process lines removed and recycled from shutdowns.

For Equipment Cleanouts

Heavy plant scrap planned, lifted, and cleared without bottlenecks.

Scope Removal

Share equipment lists, access points, and removal timing so large machinery cleanouts start with a plan.

Lift Equipment

Presses, conveyors, and plant infrastructure are loaded by material stream to keep heavy scrap moving safely.

Reconcile Tons

Final weights and metal categories are documented clearly so decommissioning jobs close out without confusion.

Planning a Plant Cleanout?

Talk to a Buyer

Questions on scope, equipment, scheduling, or pricing for your decommission? Contact a buyer directly.

Not Finding What You Need?

Reach Out Directly

If this page doesn’t cover what you need, contact us directly. Our buyers answer grading, pricing, and logistics questions specific to your operation.

Yes. Plant decommissioning is a core part of what we do — not an exception. We handle equipment identification, extraction, transport, and material disposition from your site to our Fountain Inn facility. Contact us to discuss scope and timeline before work begins.

We operate a Fuchs 360 material handler, three skidsteers, three forklifts, and a Kenworth roll-off truck. The Fountain Inn yard is 10 acres with a poured concrete north yard and active rail spur. Large equipment and high-volume clearouts are handled within our normal operating capacity.

Mixed loads are sorted and assessed by material type at the yard. Ferrous and non-ferrous are priced separately at current market rates — you are not paid a blended average. Accurate material identification at intake is how we settle. No post-delivery deductions.

Yes. We assess the material scope and provide pricing before work begins. Contact a buyer with a description of what you have — equipment types, estimated tonnage, and site location — and we will work out the removal structure and payment terms upfront.

Current Scrap Prices — Greenville, SC